INFORMATION ENGINEERING LABTORY
HOME | RESEARCH | MEMBERS | TEACHING | PUBLICATIONS |
---|
•Performance Chamber Matching By Fault Detection and Classification
Proposed method
•Fifth step of the process of seal system is the plating. Because during the different tools has the difference, we hoped that causes tools' different reduction because of the adjusting key variables. So , we need to find the key variables to control the height after plating.
Proposed method
• EWMA control base on adaptive k-means cluster
Result
• Cluster result
Result
•By linearfit P value vs. IQR P value , we f ind key variables (E1 , E2 , E3 , E4) .
•By m ultiple compare , we can find that raising the key variable will enhance y data. The setting value of key variable must be very close. We can reduce the difference between various tools by adjusting the key variable.
• Control result